Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of existing carpeting in 15 classrooms and one administrative office suite, estimated at 12,000 square feet total.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Academy District 20 is soliciting proposals to replace the heating boilers serving Academy Endeavor Elementary School and Academy International Elementary School in Colorado. Proposals are due by 2:00 PM MST on December 22, 2025.
Posted Date
-
Due Date
Dec 22, 2025
Close: Dec 22, 2025
Academy District 20 is soliciting proposals to replace the heating boilers serving Academy Endeavor Elementary School and Academy International Elementary School in Colorado. Proposals are due by 2:00 PM MST on December 22, 2025.
Premium
Access the largest public sector contact database
Eastern Connecticut State University is soliciting bids for the J.E. Smith Library Fire Pump Replacement. Work includes installing an electric-drive vertical-split case fire pump with controller, a pressure maintenance pump and controller, modifications to the fire department connection (FDC), piping, electrical work and a remote fire alarm panel; a temporary packaged diesel-drive fire pump must be provided while the permanent pump is installed. The project is a prevailing wage project with performance at Eastern Connecticut State University (83 Windham St., Willimantic, CT).
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
Eastern Connecticut State University is soliciting bids for the J.E. Smith Library Fire Pump Replacement. Work includes installing an electric-drive vertical-split case fire pump with controller, a pressure maintenance pump and controller, modifications to the fire department connection (FDC), piping, electrical work and a remote fire alarm panel; a temporary packaged diesel-drive fire pump must be provided while the permanent pump is installed. The project is a prevailing wage project with performance at Eastern Connecticut State University (83 Windham St., Willimantic, CT).
AvailableEastern Connecticut State University is soliciting bids for the J.E. Smith Library Fire Pump Replacement. Work includes installing an electric-drive vertical-split case fire pump with controller, a pressure maintenance pump and controller, modifications to the fire department connection (FDC), piping, electrical work and a remote fire alarm panel; a temporary packaged diesel-drive fire pump must be provided while the permanent pump is installed. The project is a prevailing wage project with performance at Eastern Connecticut State University (83 Windham St., Willimantic, CT).
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
Eastern Connecticut State University is soliciting bids for the J.E. Smith Library Fire Pump Replacement. Work includes installing an electric-drive vertical-split case fire pump with controller, a pressure maintenance pump and controller, modifications to the fire department connection (FDC), piping, electrical work and a remote fire alarm panel; a temporary packaged diesel-drive fire pump must be provided while the permanent pump is installed. The project is a prevailing wage project with performance at Eastern Connecticut State University (83 Windham St., Willimantic, CT).
AvailableRelease: Dec 4, 2025
Close: Dec 23, 2025
Chiller replacement
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis