Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Eastern Connecticut State University is soliciting bids for the J.E. Smith Library Fire Pump Replacement. Work includes installing an electric-drive vertical-split case fire pump with controller, a pressure maintenance pump and controller, modifications to the fire department connection (FDC), piping, electrical work and a remote fire alarm panel; a temporary packaged diesel-drive fire pump must be provided while the permanent pump is installed. The project is a prevailing wage project with performance at Eastern Connecticut State University (83 Windham St., Willimantic, CT).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Eastern Connecticut State University is soliciting bids for the J.E. Smith Library Fire Pump Replacement. Work includes installing an electric-drive vertical-split case fire pump with controller, a pressure maintenance pump and controller, modifications to the fire department connection (FDC), piping, electrical work and a remote fire alarm panel; a temporary packaged diesel-drive fire pump must be provided while the permanent pump is installed. The project is a prevailing wage project with performance at Eastern Connecticut State University (83 Windham St., Willimantic, CT).
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
Eastern Connecticut State University is soliciting bids for the J.E. Smith Library Fire Pump Replacement. Work includes installing an electric-drive vertical-split case fire pump with controller, a pressure maintenance pump and controller, modifications to the fire department connection (FDC), piping, electrical work and a remote fire alarm panel; a temporary packaged diesel-drive fire pump must be provided while the permanent pump is installed. The project is a prevailing wage project with performance at Eastern Connecticut State University (83 Windham St., Willimantic, CT).
AvailableThe project consists of a replacement of the fire pump controller in the basement of the UAB Spain Wallace facility. The scope of work includes electrical demolition and new work, as well as associated architectural and mechanical modifications as required to facilitate the equipment replacement.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
The project consists of a replacement of the fire pump controller in the basement of the UAB Spain Wallace facility. The scope of work includes electrical demolition and new work, as well as associated architectural and mechanical modifications as required to facilitate the equipment replacement.
AvailableFuel pump replacement project.
Posted Date
Nov 30, 2025
Due Date
Dec 15, 2025
Release: Nov 30, 2025
Close: Dec 15, 2025
Fuel pump replacement project.
AvailableReplacement of an existing raw sewage pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Close: Jan 6, 2026
Replacement of an existing raw sewage pump station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis