Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Fuel pump replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Fuel island replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Fuel island replacement project.
AvailablePremium
Access the largest public sector contact database
Seeking a qualified contractor to provide inspection, assessment, repair, and replacement services for the stormwater pump station. Work includes ensuring operational reliability, identifying deficiencies, performing repairs or replacements as needed, and restoring full functionality. Remove the two turbine pumps and motors and transport to an approved facility for teardown and detailed assessment. Inspect pump components including: engine/motor, impeller, shaft, bearings, stuffing boxes, bowls, seals, and couplings. Provide written findings, including recommendations for repair, replacement, or re-use of components. Advise city if some components do not need replacement to adjust schedule and cost. Remove all existing control wires, panel, conduit, floats, generator receptacles, switches, mounting hardware, and miscellaneous items. See outside link.
Posted Date
Nov 2, 2025
Due Date
Dec 11, 2025
Release: Nov 2, 2025
Close: Dec 11, 2025
Seeking a qualified contractor to provide inspection, assessment, repair, and replacement services for the stormwater pump station. Work includes ensuring operational reliability, identifying deficiencies, performing repairs or replacements as needed, and restoring full functionality. Remove the two turbine pumps and motors and transport to an approved facility for teardown and detailed assessment. Inspect pump components including: engine/motor, impeller, shaft, bearings, stuffing boxes, bowls, seals, and couplings. Provide written findings, including recommendations for repair, replacement, or re-use of components. Advise city if some components do not need replacement to adjust schedule and cost. Remove all existing control wires, panel, conduit, floats, generator receptacles, switches, mounting hardware, and miscellaneous items. See outside link.
The Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
Posted Date
Oct 17, 2025
Due Date
Dec 11, 2025
Release: Oct 17, 2025
Close: Dec 11, 2025
The Project consists generally of the following major items: Replacement of five pump station backup generators and other improvement.
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Work includes selective demolition and removal of the existing belt filter press and related equipment, installation of rotary press and related equipment, and installation of pump station screening system and related equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis