Summary
Removal and replacement of noted existing Fly Ash Slurry (FAS) piping sections, incorporation of new piping expansion loop, incorporation of new bypass line back to Process Drain Wet Well, associated valving for new lines, relocation of existing electrical conduit and utility piping in conflict with new piping, removal and replacement of Owner-Furnished, Contractor-Installed (OFCI) Process Drain Pump No. 3, removal and replacement of associated pump suction and discharge piping and valving, removal and replacement of associated OFCI pump variable frequency drive and controls, sequencing and temporary bypass pumping out of Process Drain Wet Well and other work as shown and specified in the bid documents.