Illinois Department of Transportation
State AgencyIL
-
Closes
Sep 18, 2026
(4.87-Mile) SMART Overlay project includes hot-mix asphalt removal, pavement patching, resurfacing with hot-mix asphalt, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, APS traffic signals, detector loops.
Illinois Department of Transportation lists contract 003-62V85, a 4.87-mile SMART Overlay project on Illinois Route 72 (Higgins Road) in the village of Elk Grove, Cook County. The exact posted scope covers hot-mix asphalt removal, pavement patching, resurfacing with hot-mix asphalt, pavement markings, raised reflective pavement markers, ADA ramps, APS traffic signals, and detector loops. The page lists a September 18, 2026 letting at 12:00 PM and says plans and special provisions are not available at this time.