Indiana Department of Transportation
State AgencyIN
Posted
Sep 9, 2026
Oct 7, 2026
Description: Work includes 100 LF of guardrail, resetting; 28 SY of geotextile for riprap, type 2b; 795 SY of erosion control blanket; 795 SY of mulched seeding, type r; 140 LF of pipe liner, cured-in-place, 48 in; 300 LF of temporary traffic barrier, anchored, type 2; see attached file.
StateAgency · IN, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Indiana Department of Transportation.
Adjacent opportunities open for bidding right now.
Indiana Department of Transportation
State AgencyIN
Posted
Sep 9, 2026
Oct 7, 2026
Work includes 1,291 SY of erosion control blanket; 102 LF of pipe liner, cured-in-place, 60 in. ; 24 LF of barricade, type iii-b; see attached file.
Indiana Department of Transportation
State AgencyIN
Posted
-
Oct 7, 2026
Small Structure Replacement.
Indiana Department of Transportation
State AgencyIN
Posted
Sep 9, 2026
Oct 7, 2026
Work includes 113 CY of common excavation; 236 SY of subgrade treatment, type ic; 632 SY of milling, asphalt, 1 1/2 in. ; 1,139 SY of asphalt for tack coat; 549 SY of geotextile for riprap, type 1a; 2,181 SY of erosion control blanket; 2,181 SY of mulched seeding, type r; 183 LF of pipe, type 1, circular, diameter 78 in. ; 552 LF of line, paint, solid, white, 6 in. ; 416 LF of line, paint, solid, yellow, 6 in. ; see attached file.
CityMA
Posted
Sep 4, 2026
Oct 8, 2026
Line two existing drain lines at the municipal office building.