Summary
Provide deliver and install all the equipment necessary to complete dredging, dewatering, and biosolids transport; remove biosolids from the sludge storage basins until the contract quantity is met or within six inches of the pond bottom. ; ensure minimal disturbance to basin liners and adjacent infrastructure; dewater biosolids on-site using belt filter presses or centrifuges, or an approved equivalent; ensure final cake consistency is appropriate for transportation and meets all applicable land application criteria; load dewatered biosolids directly into trailers (no site storage available); remove all equipment from the site. . See attached file.