Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Texas A&M Transportation Institute (TTI) is soliciting bids to modify an existing 30’ L x 26” W steel/Plexiglas channel at the RELLIS campus to increase its slope from 7% to 10%, while keeping the top section watertight for testing. The project requires adjustments to the pneumatic bed and bidders must provide detailed specifications; delivery and acceptance terms are 100% Net 30. A mandatory site visit and pre-bid meeting are scheduled for 2025-12-16 and bids close on 2026-01-05.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Modification of an existing channel to adjust the slope. The objective of this project is to increase the slope of the 30’ L x 26” W, steel/Plexiglas channel from 7% to 10%. The channel also includes a pneumatic bed that is raised/lowered into the bottom of the channel, and this will also need to be adjusted as part of the modification to the channel. The modifications require that the top of the channel remain unchanged, due to its location and entry port for water used during testing. Any modifications require that the top section of the channel remain watertight with the water entry feed.
Posted Date
Dec 5, 2025
Due Date
Jan 5, 2026
Release: Dec 5, 2025
Close: Jan 5, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Modification of an existing channel to adjust the slope. The objective of this project is to increase the slope of the 30’ L x 26” W, steel/Plexiglas channel from 7% to 10%. The channel also includes a pneumatic bed that is raised/lowered into the bottom of the channel, and this will also need to be adjusted as part of the modification to the channel. The modifications require that the top of the channel remain unchanged, due to its location and entry port for water used during testing. Any modifications require that the top section of the channel remain watertight with the water entry feed.
AvailableWork includes installing a new low slope standing seam metal roof over existing roof.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
Work includes installing a new low slope standing seam metal roof over existing roof.
AvailableProvide slope mowing and non-slope mowing services.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Provide slope mowing and non-slope mowing services.
AvailableProvide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →