CountyMS
Posted
Nov 11, 2026
Dec 11, 2026
Lincoln County Courthouse Second Floor Renovation - Bid Package 2
Work inlcudes courthouse second floor renovation.
Description: Hunt Jacobsen Joint Venture is seeking pre-construction assistance trade partners for five Salt Palace Convention Center packages: metal panels, curtain wall and glazed assemblies, vertical transportation, telecommunications/electronic safety and security, and audio-visual systems. The work supports a partial remodel and rebuild of the convention center, including coordination with Smith Entertainment Group’s contractor where work is affected, and selected partners will assist with design development, constructability, coordination, BIM/VDC, scheduling, procurement, labor planning, cost modeling, and a negotiated construction-cost limit. Proposals are evaluated through a competitive best-value process, with separate technical and cost proposal volumes; an NDA is required to obtain the complete bid documents.
County · UT, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyMS
Posted
Nov 11, 2026
Dec 11, 2026
Work inlcudes courthouse second floor renovation.
Harbor Beach Community Schools
School DistrictMI
Posted
Nov 10, 2026
Nov 30, 2026
Harbor Beach Renovation - Bid 2
CityMN
Posted
Nov 10, 2026
Dec 3, 2026
The City of Minneapolis is seeking bids for the electrical work in Solar Bid Package 2. The event is labeled a formal bid (RFx) in the public eSupplier listing. The listing shows bidding began November 10, 2026, and closes December 3, 2026.
Special DistrictMN
Posted
Nov 10, 2026
Dec 3, 2026
The City of Minneapolis seeks bids for materials, labor, equipment, and incidentals for electrical and duct-bank work under Solar Bid Package 2. The work includes a buried concrete duct bank, pad-mounted medium-voltage switchgear, a 480VAC:13,800VAC transformer, and concrete foundations for the switchgear and transformer. The solicitation specifies prevailing-wage requirements, a combined 3% MBE/WBE participation goal, a 5% bid deposit, and 100% payment and performance bonds.
Decision makers connected to this RFP from Salt Lake County.