Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2 ea - removal of tree; 45 LF - removal of pipe; 507 LF - removal of curb and gutter; 434 LF - sawing asphalt material (6"); 2 ea - reset structure; 1 ea - reset ground sign; 35 LF - reset chain link fence; 1 ea - adjust manhole; 650 SY - seeding; 953 SF - rock mulch (weed free); 137 ton - Hot mix asphalt (grading sx) (75) (PG 58-28); 212 SY - Concrete pavement (10"); 411 LF - 15" reinforced concrete pipe (complete in place); 1 ea - Inlet type R L 5 (5'); 20 LF - fence; 635 SY - concrete sidewalk; 89 SY - concrete curb ramp; 600 LF - 2" electrical conduit; 4 e a- luminary (install only); 1 ea - uninterrupted power supply.; 1 ea - closed circuit television camera (traffic surveillance).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pavement resurfacing & signal improvements.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Pavement resurfacing & signal improvements.
AvailableThis Invitation to Bid (ITB) for Signal #164-219 Improvements (E2025-09) requires modification of the existing traffic signal arrangement including a new mast arm, signal heads, pedestrian signals, handicap sidewalk ramps, curbing, milling and overlay of the intersection, and new pavement markings/crosswalks. The contract includes Connecticut state contract compliance goals (25% SBE; 6.25% M/W/DisBE) and will be performed in Windsor, CT between Nov 24, 2025 and Dec 22, 2025.
Posted Date
Nov 24, 2025
Due Date
Dec 22, 2025
Release: Nov 24, 2025
Close: Dec 22, 2025
This Invitation to Bid (ITB) for Signal #164-219 Improvements (E2025-09) requires modification of the existing traffic signal arrangement including a new mast arm, signal heads, pedestrian signals, handicap sidewalk ramps, curbing, milling and overlay of the intersection, and new pavement markings/crosswalks. The contract includes Connecticut state contract compliance goals (25% SBE; 6.25% M/W/DisBE) and will be performed in Windsor, CT between Nov 24, 2025 and Dec 22, 2025.
This Invitation to Bid (ITB) for Signal #164-219 Improvements (E2025-09) requires modification of the existing traffic signal arrangement including a new mast arm, signal heads, pedestrian signals, handicap sidewalk ramps, curbing, milling and overlay of the intersection, and new pavement markings/crosswalks. The contract includes Connecticut state contract compliance goals (25% SBE; 6.25% M/W/DisBE) and will be performed in Windsor, CT between Nov 24, 2025 and Dec 22, 2025.
Posted Date
Nov 24, 2025
Due Date
Dec 22, 2025
Release: Nov 24, 2025
Close: Dec 22, 2025
This Invitation to Bid (ITB) for Signal #164-219 Improvements (E2025-09) requires modification of the existing traffic signal arrangement including a new mast arm, signal heads, pedestrian signals, handicap sidewalk ramps, curbing, milling and overlay of the intersection, and new pavement markings/crosswalks. The contract includes Connecticut state contract compliance goals (25% SBE; 6.25% M/W/DisBE) and will be performed in Windsor, CT between Nov 24, 2025 and Dec 22, 2025.
Work includes construction of 5' wide concrete sidewalk, access connections, culverts, and any incidental work. The total length of the improvements is approx. 2,365 LF of sidewalk.
Posted Date
Nov 20, 2025
Due Date
Jan 6, 2026
Release: Nov 20, 2025
Close: Jan 6, 2026
Work includes construction of 5' wide concrete sidewalk, access connections, culverts, and any incidental work. The total length of the improvements is approx. 2,365 LF of sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis