CityME
Posted
Sep 3, 2026
Nov 10, 2026
Curb Replacement - BGR RFP
Work includes replacement of approx 240' of the current concrete curb; saw-cut existing sidewalk; remove 18" of concrete walk, curb, and 12" pavement; drill and pin into existing concrete walk after granite is placed; edge to make a decorative replacement; replace pavement in front of granite;vertical granite curb must be at minimum 5"x16".
