Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of existing boilers, pumps, associated equipment, cabinet unit heaters, controls, and installation of new boilers, pumps, cabinet unit heaters and new controls that are identified on the mechanical and electrical contract documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes to replace heating and domestic hot water systems well as ancillary electrical, controls, and painting modifications.
Posted Date
Jan 5, 2026
Due Date
Jan 28, 2026
Release: Jan 5, 2026
Close: Jan 28, 2026
Work includes to replace heating and domestic hot water systems well as ancillary electrical, controls, and painting modifications.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Chelsea Housing Authority is soliciting quotes from qualified mechanical/plumbing engineering firms to perform an electric-only Domestic Hot Water (DHW) Modernization & Leak-Risk Reduction Study for Buckley Apartments, a seven-story, 210-unit multifamily building at 14 Bloomingdale St, Chelsea, MA. The selected firm will inspect existing hot water tanks, evaluate options to reduce leak risk and modernize the system (including central hot water plant, heat-pump hot water, consolidation, or fixes), and provide cost estimates, pros/cons, energy impacts, and a final report with recommendations plus a presentation. Period of performance begins after contractor selection and the study must be completed by January 9, 2026.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Chelsea Housing Authority is soliciting quotes from qualified mechanical/plumbing engineering firms to perform an electric-only Domestic Hot Water (DHW) Modernization & Leak-Risk Reduction Study for Buckley Apartments, a seven-story, 210-unit multifamily building at 14 Bloomingdale St, Chelsea, MA. The selected firm will inspect existing hot water tanks, evaluate options to reduce leak risk and modernize the system (including central hot water plant, heat-pump hot water, consolidation, or fixes), and provide cost estimates, pros/cons, energy impacts, and a final report with recommendations plus a presentation. Period of performance begins after contractor selection and the study must be completed by January 9, 2026.
AvailableReplacement of (2) domestic hot water heaters. Located in the southeast corner of the pool mechanical room. Handles domestic hot water for the entire facility, with the exception of the northwest corner. Current units: AO Smith Cyclone Xi model BTH 400A 104 natural gas units. Needs removal and approved disposal of current units, and replacement with (2) 399,900 BTU/hr 119 gallon commercial gas-fired condensing water heaters.
Posted Date
Dec 18, 2025
Due Date
Jan 20, 2026
Release: Dec 18, 2025
Close: Jan 20, 2026
Replacement of (2) domestic hot water heaters. Located in the southeast corner of the pool mechanical room. Handles domestic hot water for the entire facility, with the exception of the northwest corner. Current units: AO Smith Cyclone Xi model BTH 400A 104 natural gas units. Needs removal and approved disposal of current units, and replacement with (2) 399,900 BTU/hr 119 gallon commercial gas-fired condensing water heaters.
AvailableHeadquarters office building HVAC system upgrades.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Release: Dec 5, 2025
Close: Jan 20, 2026
Headquarters office building HVAC system upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →