Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and install landscaping package around a wet detention system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 10 CY extra excavation (hand labor); 100 CY extra excavation (machine); 10 CY extra concrete (class a); 10 CY extra concrete (class b); 10 ton extra cement stabilized sand (bedding or backfill) for water lines; 2 sacks/ton; 10 ton extra cement stabilized sand (bedding or backfill) for storm sewer; 1-1/2 sacks/ton; 100 CY crushed stone in trench bottom for pipe bedding in wet sand areas, including compaction, complete in place; 500 CY cement stabilized crushed stone for pipe bedding in wet sand areas, including compaction, complete in place; 100 CY cement stabilized sand for pipe bedding in wet sand areas, including compaction, complete in place; 2,500 LF deep wells for dewatering, complete in place. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 28, 2026
Work includes 10 CY extra excavation (hand labor); 100 CY extra excavation (machine); 10 CY extra concrete (class a); 10 CY extra concrete (class b); 10 ton extra cement stabilized sand (bedding or backfill) for water lines; 2 sacks/ton; 10 ton extra cement stabilized sand (bedding or backfill) for storm sewer; 1-1/2 sacks/ton; 100 CY crushed stone in trench bottom for pipe bedding in wet sand areas, including compaction, complete in place; 500 CY cement stabilized crushed stone for pipe bedding in wet sand areas, including compaction, complete in place; 100 CY cement stabilized sand for pipe bedding in wet sand areas, including compaction, complete in place; 2,500 LF deep wells for dewatering, complete in place. See attached file.
AvailableSealed bids are solicited by Bridgeland Development, LP on behalf of Harris County Water Control & Improvement District No. 159 for construction of the Upper Langham Creek Phase 3 Channel and Detention Design, Contract 2, including extensive earthwork and reinforced concrete box/pipe installations. Bids are due 2:00 p.m. local time on February 11, 2026 and will be opened publicly in the BGE, Inc. office and via Microsoft Teams; a non-mandatory pre-bid Microsoft Teams conference is scheduled for February 4, 2026 at 2:00 p.m. Plans and bid documents are available via the civcast site (search ID 15985-00).
Posted Date
Jan 18, 2026
Due Date
Feb 11, 2026
Release: Jan 18, 2026
Close: Feb 11, 2026
Sealed bids are solicited by Bridgeland Development, LP on behalf of Harris County Water Control & Improvement District No. 159 for construction of the Upper Langham Creek Phase 3 Channel and Detention Design, Contract 2, including extensive earthwork and reinforced concrete box/pipe installations. Bids are due 2:00 p.m. local time on February 11, 2026 and will be opened publicly in the BGE, Inc. office and via Microsoft Teams; a non-mandatory pre-bid Microsoft Teams conference is scheduled for February 4, 2026 at 2:00 p.m. Plans and bid documents are available via the civcast site (search ID 15985-00).
AvailablePhase 2 includes approxmn 1,350 LF of a two lane undivided roadway section. The project includes earthwork, storm sewer, water main, roadway paving, sidewalk ramps, signing, pavement marking, traffic control, ditch grading, erosion control, and final surface restoration.
Posted Date
Jan 14, 2026
Due Date
Feb 10, 2026
Release: Jan 14, 2026
Close: Feb 10, 2026
Phase 2 includes approxmn 1,350 LF of a two lane undivided roadway section. The project includes earthwork, storm sewer, water main, roadway paving, sidewalk ramps, signing, pavement marking, traffic control, ditch grading, erosion control, and final surface restoration.
AvailableThe City of Key Colony Beach (FL) issued ITB 2026-01 seeking bids to furnish and install pervious pavers on 7th Street and Shelter Bay Drive. Bids are due February 13, 2026, and must be submitted to the City Administrator's office for a public opening. The project requires contractors licensed in Florida with relevant experience to obtain bidding documents from the issuing office or the DemandStar portal.
Posted Date
Jan 23, 2026
Due Date
Feb 13, 2026
Release: Jan 23, 2026
Close: Feb 13, 2026
The City of Key Colony Beach (FL) issued ITB 2026-01 seeking bids to furnish and install pervious pavers on 7th Street and Shelter Bay Drive. Bids are due February 13, 2026, and must be submitted to the City Administrator's office for a public opening. The project requires contractors licensed in Florida with relevant experience to obtain bidding documents from the issuing office or the DemandStar portal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →