Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of stone building foundation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of installing a new concrete foundation and slab for a new 52' x 30 2" x 11' storage building with a 10 lean-to.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Work consist of installing a new concrete foundation and slab for a new 52' x 30 2" x 11' storage building with a 10 lean-to.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply of 3,500 TN of 1b stone; 300 TN of 2b stone; 3,500 TN of 2a stone; 2,000 TN of 2rc stone; 800 TN of anti-skid; 150 TN of crusher run; 200 TN of stock pile patching 8; 2000 TN of 9. 5 mm superpave; 5,000 TN of dsa 10; 300 TN of #1 stone; 300 TN of #3 stone; 300 TN of #4 stone; 100 TN of r4 stone; 300 TN of washed aashto no. 8; 1,000 TN of 12. 5 mm blacktop; 500 TN of 19 mm blacktop; 500 TN of granular fill, special modified; 200 TN of rip rap; 100 TN of pond sand; 300 TN of #67 stone; 200 TN of limestone dust.
Posted Date
Jan 9, 2026
Due Date
Mar 4, 2026
Release: Jan 9, 2026
Close: Mar 4, 2026
Supply of 3,500 TN of 1b stone; 300 TN of 2b stone; 3,500 TN of 2a stone; 2,000 TN of 2rc stone; 800 TN of anti-skid; 150 TN of crusher run; 200 TN of stock pile patching 8; 2000 TN of 9. 5 mm superpave; 5,000 TN of dsa 10; 300 TN of #1 stone; 300 TN of #3 stone; 300 TN of #4 stone; 100 TN of r4 stone; 300 TN of washed aashto no. 8; 1,000 TN of 12. 5 mm blacktop; 500 TN of 19 mm blacktop; 500 TN of granular fill, special modified; 200 TN of rip rap; 100 TN of pond sand; 300 TN of #67 stone; 200 TN of limestone dust.
AvailableThe project also includes upgrades to the building s crawl space, involving the removal, replacement, and installation of insulation, intake, and exhaust systems. These improvements are designed to enhance energy efficiency, improve ventilation, and strengthen overall facility performance.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
The project also includes upgrades to the building s crawl space, involving the removal, replacement, and installation of insulation, intake, and exhaust systems. These improvements are designed to enhance energy efficiency, improve ventilation, and strengthen overall facility performance.
AvailableProcurement of building materials.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Procurement of building materials.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →