Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of building materials.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design, fabricate, and install new exterior building signage to replace individually mounted, vacuum-formed plastic letters and numbers with a new signage system that reflects a more contemporary aesthetic, utilizes higher-quality and longer-lasting materials, and supports consistent application across multiple locations.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Design, fabricate, and install new exterior building signage to replace individually mounted, vacuum-formed plastic letters and numbers with a new signage system that reflects a more contemporary aesthetic, utilizes higher-quality and longer-lasting materials, and supports consistent application across multiple locations.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of a building.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
Work includes demolition of a building.
AvailableSeeking for instructional materials.
Posted Date
Jul 10, 2025
Due Date
Jun 4, 2026
Release: Jul 10, 2025
Close: Jun 4, 2026
Seeking for instructional materials.
AvailableRemove the existing roofing system and install a new, fully warranted roofing system at the building. Remove and properly dispose of existing roofing materials. Install new roofing system (specify type: e.g., TPO, EPDM, metal, etc.). Include insulation, flashing, drainage systems, and sealants.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Remove the existing roofing system and install a new, fully warranted roofing system at the building. Remove and properly dispose of existing roofing materials. Install new roofing system (specify type: e.g., TPO, EPDM, metal, etc.). Include insulation, flashing, drainage systems, and sealants.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →