Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sewer replacement 1. Vinyl plank install 2. Tub/surround replacement 3. Paint entire unit 4. Plumbing fixture and vanity replacement 5. Cabinet and countertop/sin reinstallation or replacement 6. Wiring, breaker and receptacle replacement 7. Waste line replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
AvailableWork includes approx 361 LF 10" storm sewer; 662 LF 12" PVC SDR 26; 1 Ls preconstruction vide taping and documentation; 280 SF 5" PCC sidewalk removal and replacement; 560 LF sanitary sewer service removal and replacement; 530 LF water service line removal and replacement (long side).
Posted Date
Jan 19, 2026
Due Date
Feb 11, 2026
Release: Jan 19, 2026
Close: Feb 11, 2026
Work includes approx 361 LF 10" storm sewer; 662 LF 12" PVC SDR 26; 1 Ls preconstruction vide taping and documentation; 280 SF 5" PCC sidewalk removal and replacement; 560 LF sanitary sewer service removal and replacement; 530 LF water service line removal and replacement (long side).
AvailableWork includes approx 950 LF of watermain with flow fill; 980 LF of 4" CIP water main to 8" C900 watermain; replace one 4' sanitary sewer manhole and rehabilitate three 4' sanitary sewer manhole. Construction includes valves, manholes, air relief vaults, water and sewer service connections, curb valves, and cleanouts; roadway work consists of concrete curbs, gutters, pans, sidewalks, storm sewers, inlets. See outside link.
Posted Date
Dec 4, 2025
Due Date
Jan 30, 2026
Release: Dec 4, 2025
Close: Jan 30, 2026
Work includes approx 950 LF of watermain with flow fill; 980 LF of 4" CIP water main to 8" C900 watermain; replace one 4' sanitary sewer manhole and rehabilitate three 4' sanitary sewer manhole. Construction includes valves, manholes, air relief vaults, water and sewer service connections, curb valves, and cleanouts; roadway work consists of concrete curbs, gutters, pans, sidewalks, storm sewers, inlets. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →