City of Richmond
Sewer replacement 1. Vinyl plank install 2. Tub/surround replacement 3. Paint entire unit 4. Plumbing fixture and vanity replacement 5. Cabinet and countertop/sin reinstallation or replacement 6. Wiring, breaker and receptacle replacement 7. Waste line replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Huntington Beach
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
City of Huntington Beach
Close: Nov 20, 2025
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.
AvailableCity of Huntington Beach
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
Posted Date
Oct 15, 2025
Due Date
Nov 20, 2025
Release: Oct 15, 2025
City of Huntington Beach
Close: Nov 20, 2025
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
Lyon County
The project consist of approx 1,380 lf install 12" sdr 35 sewer main via open trench; 251 lf install 12" sdr 35 sewer main with 36" steel casing via jack and bore; 560 install pre-cast concrete wall. 130 lf remove ex. 8-inch asbestos cement sewer main; 1 ls abandon ex. 8-inch sewer main in-place; 59 lf remove ex. 10-inch asbestos cement sewer main; 4 ea abandon ex. 48-inch sewer manhole; 1 ea remove ex. 48-inch sewer manhole; 86 lf install proposed 8-inch sdr 35 sewer main via open trench; 7 lf install proposed 10-inch sdr 35 sewer main via open trench; 1377 lf install proposed 12-inch sdr 35 sewer main via open trench; 235 lf install proposed 12-inch sdr 26 sewer main via open trench; 254 lf install proposed 12-inch sdr 35 sewer main with 36-inch steel casing via jack & bore. See attached file.
Posted Date
Mar 11, 2025
Due Date
Nov 17, 2025
Release: Mar 11, 2025
Lyon County
Close: Nov 17, 2025
The project consist of approx 1,380 lf install 12" sdr 35 sewer main via open trench; 251 lf install 12" sdr 35 sewer main with 36" steel casing via jack and bore; 560 install pre-cast concrete wall. 130 lf remove ex. 8-inch asbestos cement sewer main; 1 ls abandon ex. 8-inch sewer main in-place; 59 lf remove ex. 10-inch asbestos cement sewer main; 4 ea abandon ex. 48-inch sewer manhole; 1 ea remove ex. 48-inch sewer manhole; 86 lf install proposed 8-inch sdr 35 sewer main via open trench; 7 lf install proposed 10-inch sdr 35 sewer main via open trench; 1377 lf install proposed 12-inch sdr 35 sewer main via open trench; 235 lf install proposed 12-inch sdr 26 sewer main via open trench; 254 lf install proposed 12-inch sdr 35 sewer main with 36-inch steel casing via jack & bore. See attached file.
City of Kenton
Project includes 89 CY asphalt concrete base, pg64-22, (449); 87 CY asphalt concrete intermediate course, type 2, (449); 14 CY 6" non-reinforced concrete pavement; 235 SF 4" concrete walk; see outside link.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
City of Kenton
Close: Nov 20, 2025
Project includes 89 CY asphalt concrete base, pg64-22, (449); 87 CY asphalt concrete intermediate course, type 2, (449); 14 CY 6" non-reinforced concrete pavement; 235 SF 4" concrete walk; see outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis