Retrieving RFP details
Release
Close
City of Simi Valley
Work includes the rehabilitation and coating of 26 manholes with varying depths, confined space entry, step removal, manhole cleaning, surface preparation, mineral deposit removal, concrete spot repairs. See attached file.
a5580baf6c294214b47b8979d5e5bf08
City of Salt Lake City
Rehabilitation of 44 existing sewer manholes and vaults with epoxy manhole coating system.
City of Georgetown
Perform cure in place pipe (cipp) and sanitary sewer manhole rehabilitation work. Bypass Pumping Operations of Existing Sanitary Sewer, 1,277 LF of Cured-in-Place Pipe 12-in Sewer (Manhole to Manhole), All Depths (ML-15, ML-16, ML-18, & ML-19); 813 LF of Cured-in-Place Pipe 15-in Sewer (Manhole to Manhole), All Depths (ML-5, ML-6); 2,090 LF of Sewer Cleaning/Silt Removal Prior to CCTV- Heavy Cleaning (All Diameters); 12 EA of Reconnect Active Sewer Laterals to CIPP Lined Pipe, All Sizes All Depths; 12 EA of Service Lateral CIPP End Seal; 19 EA of Furnish and Install Flexible Chimney Seal, 24"; 6 EA of Repairing and Rebuilding Brickwork for Inverts, Benches, Walls, and Chimneys in Manholes (1818,1829,1830,1834,1837, and 1839), 173 VF of Sewer Manhole Monolithic Lining, 4-FT Dia. Manhole.
Newport Mud
Provide sanitary sewer phase 8 manhole rehabilitation. In general, this work consists of: cleaning and preparing of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, etc; repair of sanitary sewer manholes including cementitious lining, epoxy lining, removing and replacing frames and covers, raising sanitary sewer manholes, repair of bench and invert, and grouting exterior of manhole frames; bypass pumping, as directed by engineer, to properly rehabilitate any manholes where a flow through bridge or plug is not a viable option. The cost for flow through bridges or plugs shall be included in other work items. See outside link.
Release
Oct 25, 2025
Close
Nov 20, 2025