Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Install 34.5KV and 12.74KV medium voltage equipment and conductor. Install relevant low voltage signal and power cables and equipment such as potential signals, current signals, and AC power. Install foundations, grounding, conduit, and other below grade items as required. Install structures and foundations as required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Premium
Access the largest public sector contact database
Work includes site grading, detention/retention areas, and erosion control measures. Installation of substation security fencing. Erection of 69kV and 15kV steel bus structures, bus work, and associated equipment. Erection of overhead static wires and supporting structures for substation lightning protection. Installation of all above and below grade substation grounding and foundations. Installation of AC and DC control and power cables. Installation of the secondary containment systems around the new and existing station transformer. Installation of all junction boxes, conduit, and raceway (above and below grade). Installation of 15kV feeder exit circuits to designated locations outside the substation yard fence. Receive, unload, move, store and install all owner furnished materials specified or indicated.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes site grading, detention/retention areas, and erosion control measures. Installation of substation security fencing. Erection of 69kV and 15kV steel bus structures, bus work, and associated equipment. Erection of overhead static wires and supporting structures for substation lightning protection. Installation of all above and below grade substation grounding and foundations. Installation of AC and DC control and power cables. Installation of the secondary containment systems around the new and existing station transformer. Installation of all junction boxes, conduit, and raceway (above and below grade). Installation of 15kV feeder exit circuits to designated locations outside the substation yard fence. Receive, unload, move, store and install all owner furnished materials specified or indicated.
AvailableSubstation panels for the central city substation.
Posted Date
Dec 2, 2025
Due Date
Dec 31, 2025
Release: Dec 2, 2025
Close: Dec 31, 2025
Substation panels for the central city substation.
AvailableWork includes construction of substation.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
Work includes construction of substation.