Summary
Project includes shipping and handling to the site, and other items incidental work indicated on the plans and specifications, including the following Work:\r •Remove existing overhead power infrastructure along E Hillcrest Drive between Eastridge Drive and Plum Creek Trail. Construct a 3Ø underground 12.47KV power distribution feeder between Eastridge Drive and Plum Creek Trail, including underground cable in rigid conduit, cable terminations in padmount equipment, overhead wood poles with new underground risers and terminations, and new metering equipment.\r •Install Owner-furnished 15KV padmounted switchgear (qty 3), junction cabinet (qty 1), and primary metering cabinet (qty 1).\r •Make MV connections to Owner-furnished padmounted equipment, including switchgear, junction cabinet, primary meter cabinet, and underground risers on Owner-furnished wood poles (qty 4). Other construction as specified in bidding documents.