Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation (Section 2 Grind and Overlay - CIP C2212) requests construction services for pavement grinding and overlay in California under NAICS 237310. The posting was published 2026-01-15 and the bid/closing deadline is 2026-02-12 at 02:00 PM PST (2026-02-12T22:00:00Z). Bid documents and issuer contact information are restricted to registered members on the posting platform.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx. 1 LS of clearing and grubbing; 8 EA of removal of tree; 8,830 SF of concrete curb and gutter, sidewalk; 130 CY of roadway excavation; 3,480 SF pf base failure repair(AC); 69,491 SF of cold plane asphalt concrete(0.25 depth); 1,390 TN of 1/2" max hot mix asphalt type A; 3,460 SF of minor concrete sidewalk; 21 SF of landscaping; 2 EA of roadside sign; 420 SF of thermoplastic pavement marking.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 1 LS of clearing and grubbing; 8 EA of removal of tree; 8,830 SF of concrete curb and gutter, sidewalk; 130 CY of roadway excavation; 3,480 SF pf base failure repair(AC); 69,491 SF of cold plane asphalt concrete(0.25 depth); 1,390 TN of 1/2" max hot mix asphalt type A; 3,460 SF of minor concrete sidewalk; 21 SF of landscaping; 2 EA of roadside sign; 420 SF of thermoplastic pavement marking.
Pavement maintenance of existing roadway improvements including cold planing existing asphalt; installing pavement reinforcing fabric; pavement overlays of various thicknesses; localized repairs (digouts or base repairs); adjusting utility covers if needed; removing and installing ada compliant curb ramps; removing and replacing pavement striping, markings and markers; traffic control; and all appurtenant work required to complete the project.
Posted Date
Dec 22, 2025
Due Date
Jan 22, 2026
Release: Dec 22, 2025
Close: Jan 22, 2026
Pavement maintenance of existing roadway improvements including cold planing existing asphalt; installing pavement reinforcing fabric; pavement overlays of various thicknesses; localized repairs (digouts or base repairs); adjusting utility covers if needed; removing and installing ada compliant curb ramps; removing and replacing pavement striping, markings and markers; traffic control; and all appurtenant work required to complete the project.
AvailableWork includes 407,137 SY conform grind asphalt pavement; 1,677 TN 1/2" type a hma overlay (0.13 ft thick); 7,431 TN 3/4" type a hma overlay (0.20 ft thick); 3,683 TN 1/2" type b hs hma overlay (0.13 ft thick); 3,309 TN class 2 aggregate base (shoulder backing); 11,020 LF detail 6 - single skip yellow striping; 376 LF detail 19 - solid skip yellow striping; 13,932 LF detail 22 - double yellow striping. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Work includes 407,137 SY conform grind asphalt pavement; 1,677 TN 1/2" type a hma overlay (0.13 ft thick); 7,431 TN 3/4" type a hma overlay (0.20 ft thick); 3,683 TN 1/2" type b hs hma overlay (0.13 ft thick); 3,309 TN class 2 aggregate base (shoulder backing); 11,020 LF detail 6 - single skip yellow striping; 376 LF detail 19 - solid skip yellow striping; 13,932 LF detail 22 - double yellow striping. See attached file.
AvailableThe project consists of applying an asphalt mill and overlay on various asphalt streets and parking areas. Work includes 23,250 SY of 3" HIMOD asphalt overlay; 26,500 SY of 2" HIMOD asphalt overlay; 3280 SY of 3" asphalt overlay.
Posted Date
Jan 10, 2026
Due Date
Feb 4, 2026
Release: Jan 10, 2026
Close: Feb 4, 2026
The project consists of applying an asphalt mill and overlay on various asphalt streets and parking areas. Work includes 23,250 SY of 3" HIMOD asphalt overlay; 26,500 SY of 2" HIMOD asphalt overlay; 3280 SY of 3" asphalt overlay.