City of Seaford
WWTF generally consists of, but is not limited to, the construction/installation of: headworks structure and primary screening improvements, influent pumping station rehabilitation, a new grit removal / handling structure including flow splitter box and provisions for future secondary screening equipment, rehabilitation of both primary clarifiers, a new septage handling facility, electrical power, mechanical (hvac) and controls / scada improvements necessary to serve proposed improvement areas, necessary site work and stormwater management improvements, and sea level rise mitigation measures.
City of Newberry
Wastewater treatment facility (WWTF) expansion.
Town of Elkin
Apron expansion includes, sediment basins for primary erosion control, approx. 58,000 CY of embankment in place, approx. 1,200 LF of storm pipe, approx. 2,300 CY of crushed aggregate base course, and approx. 2,300 TN of asphalt surface course (S9,5B). Partial parallel taxiway includes, sediment basins for primary erosion control, approx. 57,000 CY of embankment in place, approx. 1,500 LF of storm pipe, approx. 2,100 CY of crushed aggregate base course, approx. 2,100 TN of asphalt surface course (S9,5B), and edge lighting / signage for the new partial parallel taxiway system.
City of Horicon
Upgrade to the wastewater treatment process including, but not limited to replacement of existing mechanical fine screen and washer compactor, replacement of influent wastewater pumps, demolition of existing aerated grit system, conversion of grit building to blower room with new aeration blowers, new concrete selector basins, conversion of oxidation ditch, new fine bubble diffusers, new concrete aerobic digester, new belt press sludge dewatering system, new treatment building, new UV disinfection system, new filtration system.
Release
Oct 07, 2025
Close
Nov 12, 2025