Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
WWTF generally consists of, but is not limited to, the construction/installation of: headworks structure and primary screening improvements, influent pumping station rehabilitation, a new grit removal / handling structure including flow splitter box and provisions for future secondary screening equipment, rehabilitation of both primary clarifiers, a new septage handling facility, electrical power, mechanical (hvac) and controls / scada improvements necessary to serve proposed improvement areas, necessary site work and stormwater management improvements, and sea level rise mitigation measures.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of chemical feed systems, force main valve installation, and control manhole valve modification.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
Project consists of chemical feed systems, force main valve installation, and control manhole valve modification.
AvailableThe work includes furnishing all material, equipment, labor, supervision and other requirements necessary to provide, install, and commission 3 replacement positive displacement digester blowers and motors, 3 turbo blowers and motors with VFDs to replace existing centrifugal aeration blowers, 2 dissolved oxygen probes with controller(s), LED lighting to replace high pressure sodium site lighting, and monitoring equipment at 6 lift stations.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Close: Feb 9, 2026
The work includes furnishing all material, equipment, labor, supervision and other requirements necessary to provide, install, and commission 3 replacement positive displacement digester blowers and motors, 3 turbo blowers and motors with VFDs to replace existing centrifugal aeration blowers, 2 dissolved oxygen probes with controller(s), LED lighting to replace high pressure sodium site lighting, and monitoring equipment at 6 lift stations.
City of Hinesville seeks Construction Management at Risk Services for the expansion and upgrade of its Water Reclamation Facility from 2.0 MGD to 4.0 MGD, including force main installation and various WRF component upgrades.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
City of Hinesville seeks Construction Management at Risk Services for the expansion and upgrade of its Water Reclamation Facility from 2.0 MGD to 4.0 MGD, including force main installation and various WRF component upgrades.
AvailableWest Cocalico Township Authority is soliciting bids via PennBid for the construction of a new approximately 2,500 SF garage pole building that includes an office and associated site work. The project is divided into three contracts: General Construction, Electrical Construction, and Mechanical Construction. Bids are due by 10:00 AM EST on February 2, 2026, and the project is subject to Pennsylvania Prevailing Wage and other statutory requirements.
Posted Date
Dec 29, 2025
Due Date
Feb 2, 2026
Release: Dec 29, 2025
Close: Feb 2, 2026
West Cocalico Township Authority is soliciting bids via PennBid for the construction of a new approximately 2,500 SF garage pole building that includes an office and associated site work. The project is divided into three contracts: General Construction, Electrical Construction, and Mechanical Construction. Bids are due by 10:00 AM EST on February 2, 2026, and the project is subject to Pennsylvania Prevailing Wage and other statutory requirements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis