CityMA
Posted
Nov 6, 2026
Nov 20, 2026
RFB Trade Contractor Services WECC - Wilmington Elementary School
Building construction and support and maintenance and repair.
Description: DCAMM is seeking bids from prequalified trade contractors for Phase 2 of the SDE – Middleton Jail and HOC – Medical & Kitchen Building/ISB Replacement project in Middleton, Massachusetts. The solicitation covers 14 trade sections, including masonry, roofing, glazing, plumbing, HVAC, and electrical, with Commodore Builders, LLC serving as construction manager. The associated state project page identifies the Essex Sheriff’s Department, and bids are due November 9, 2026, at 5:00 p.m. UTC.
PoliceDepartment · MA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Essex County Sheriff's Department.
These related opportunities are still open for bidding.
CityMA
Posted
Nov 6, 2026
Nov 20, 2026
Building construction and support and maintenance and repair.
Posted
Nov 10, 2026
Dec 16, 2026
SPECIFICATIONS POSTED: https://columbusga.gov/finance/bid-opportunities The project¿s Base Bid consists of improvements to Carver Lake Park, including demolition and removal of existing site improvements; clearing and grubbing; earthwork and grading; construction and reconstruction of access drives and parking areas; asphalt pavement, permeable pavers, concrete sidewalks, curb and gutter; pedestrian trails; playground and pavilion areas; fencing; site signage and pavement markings; landscaping and site restoration; and associated storm drainage and utility improvements. The Work also includes construction of a 10-foot-wide multi-use trail, parking and accessible parking improvements, pedestrian crossings, park benches, landscape islands, and supporting infrastructure associated with the redevelopment of the park. Recreational improvements include playground and pavilion areas and improvements surrounding the existing splash pad.
CityCA
Posted
Oct 23, 2026
Nov 17, 2026
The Project consists of but not limited to approx. 2 EA Furnish and Install Project Information Signs; 1,111 LF Sawcut; 7,479 SF 2" Minimum Asphalt Concrete Mill; 17,345 SF Remove and Dispose of Pre-Cast Concrete Pavers, Sidewalk, Curb Ramp and Aggregate Base; 1,440 LF Remove and Dispose of Curb & Gutter and Aggregate Base; 17 EA Remove and Dispose of Trees; 4,755 SY Remove and Dispose of AC and Base; 1,885 CY Class II Aggregate Base; 1,198 TN Hot Mix Asphalt (HMA) Pavement; 2,285 SF Furnish and Install Concrete Pavers (Pedestrian); 8 EA Construct Integral Colored Concrete Curb Ramp Type A; 870 SF Construct 7.5" Integral Colored Concrete Driveway; 1,195 LF Construct 6" Integral Colored Concrete Type G Curb and Gutter; 8,225 SF Construct 4" Integral Colored Concrete Sidewalk; 15 EA Furnish and Install Tree Grate and Frame; 19 EA Furnish and Install 24" Box Tree; 1,020 LF Install City Furnished Festoon Lighting Assembly; see bid documents for further details.
CityBC
Posted
Oct 23, 2026
Jan 5, 2027
The City of Victoria issued Request for Proposal (RFP) 25-103 Construction Manager – Crystal Pool & Wellness Centre Replacement Project and awarded the competition to ETRO Construction Ltd. and Durwest Construction Management, in Joint Venture.