Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Trailheads and Trail Connections Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Trail phase 2 project.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Trail phase 2 project.
AvailablePremium
Access the largest public sector contact database
Work generally includes: clearing of approx. 4,750 LF of trail path, excavation of trail path to a width of ten feet and depth of 12", installation of approx. 70 tons of gravel, and installation of three 20' drainage/culvert pipes within the project area; as well as reseeding of all disturbed areas.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Close: Jan 7, 2026
Work generally includes: clearing of approx. 4,750 LF of trail path, excavation of trail path to a width of ten feet and depth of 12", installation of approx. 70 tons of gravel, and installation of three 20' drainage/culvert pipes within the project area; as well as reseeding of all disturbed areas.
AvailableConstruction of an approximately 0.75-mile asphalt trail, including boardwalk sections, retaining walls, and fencing.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Construction of an approximately 0.75-mile asphalt trail, including boardwalk sections, retaining walls, and fencing.
AvailableThe Town of Loomis is soliciting bids for the Montserrat Equestrian Trail Repair Project, which includes ripping the surface, grading, establishing positive drainage, and installing decomposed granite paving. The estimated project cost is between $100,000 and $200,000, with a project duration of 20 working days and prevailing wage and licensing requirements (Class A or C-12 and Town business license). Bidders must submit a 10% bid guarantee and perform at least 30% of work with their own employees and equipment.
Posted Date
Nov 4, 2025
Due Date
Jan 15, 2026
Release: Nov 4, 2025
Close: Jan 15, 2026
The Town of Loomis is soliciting bids for the Montserrat Equestrian Trail Repair Project, which includes ripping the surface, grading, establishing positive drainage, and installing decomposed granite paving. The estimated project cost is between $100,000 and $200,000, with a project duration of 20 working days and prevailing wage and licensing requirements (Class A or C-12 and Town business license). Bidders must submit a 10% bid guarantee and perform at least 30% of work with their own employees and equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis