Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing and setting in place one 5 MVA substation transformer.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
For furnishing power transformer; one (1) 11.2/14 MVA at 65°C, ONAN/ONAF, 67 kV Delta to 12.47 GRDY with LTC and accessories. See outside link for more details.
Posted Date
Dec 17, 2025
Due Date
Jan 28, 2026
Release: Dec 17, 2025
Close: Jan 28, 2026
For furnishing power transformer; one (1) 11.2/14 MVA at 65°C, ONAN/ONAF, 67 kV Delta to 12.47 GRDY with LTC and accessories. See outside link for more details.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project will consist of furnishing labor, material, and equipment for the construction of one 7500 KVA substation that will consist of 69 KV rated high voltage tubular steel dead end, 15 KV tubular steel structures, underground 15 KV conduit, and other associated equipment and material for substation power delivery.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
The Project will consist of furnishing labor, material, and equipment for the construction of one 7500 KVA substation that will consist of 69 KV rated high voltage tubular steel dead end, 15 KV tubular steel structures, underground 15 KV conduit, and other associated equipment and material for substation power delivery.
AvailableSubstation panels for the central city substation.
Posted Date
Dec 2, 2025
Due Date
Dec 31, 2025
Release: Dec 2, 2025
Close: Dec 31, 2025
Substation panels for the central city substation.
AvailableWork includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →