Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of lift station decommission, installation of a sanitary sewer line and connection to existing stub out. Work includes, 140 LF of install, maintain & remove 8" biodegradable erosion control log; 45 SY of furnishing & placing top soil (2"); 45 Sy of sodding; 130 LF of remove existing chain-link fence; 30 LF of remove & replace 8' wood fence;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Premium
Access the largest public sector contact database
Work consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.
AvailableThe City of Highfill, Arkansas is soliciting sealed bids for the Hutchens Road - Lift Station No.1 Pumping Upgrades project, which includes lift station modifications, pump improvements, emergency generator installation, a new concrete slab, and electrical/SCADA upgrades. Bid documents are available from Engineering Services, Inc. (printed) or digitally via QuestCDN/engineeringservices.com for a non-refundable fee; bidders must provide bid security. Bids are due January 8, 2026 at 2:00 p.m. local time and will be publicly opened at Highfill City Hall.
Posted Date
Dec 7, 2025
Due Date
Jan 8, 2026
Release: Dec 7, 2025
Close: Jan 8, 2026
The City of Highfill, Arkansas is soliciting sealed bids for the Hutchens Road - Lift Station No.1 Pumping Upgrades project, which includes lift station modifications, pump improvements, emergency generator installation, a new concrete slab, and electrical/SCADA upgrades. Bid documents are available from Engineering Services, Inc. (printed) or digitally via QuestCDN/engineeringservices.com for a non-refundable fee; bidders must provide bid security. Bids are due January 8, 2026 at 2:00 p.m. local time and will be publicly opened at Highfill City Hall.
AvailableWork includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
Posted Date
Nov 7, 2025
Due Date
Dec 17, 2025
Release: Nov 7, 2025
Close: Dec 17, 2025
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
AvailableThe City of Friendswood seeks sealed bids for the rehabilitation of sanitary sewer Lift Station No. 4 under its 2020 Lift Station Mitigation program. Bids are due January 7, 2026 at 2:00 PM CST, with a pre‑bid meeting on December 8, 2025 at 10:00 AM.
Posted Date
Nov 19, 2025
Due Date
Jan 7, 2026
Release: Nov 19, 2025
Close: Jan 7, 2026
The City of Friendswood seeks sealed bids for the rehabilitation of sanitary sewer Lift Station No. 4 under its 2020 Lift Station Mitigation program. Bids are due January 7, 2026 at 2:00 PM CST, with a pre‑bid meeting on December 8, 2025 at 10:00 AM.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis