Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes lab building construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
In general, the work consists of: acoustic improvements within the Center of the Arts Music Department, including upgrades to practice rooms, ensemble/classroom spaces, faculty instructional studios, a secondary wing of practice labs, and the recital hall. Work includes selective interior demolition, reconstruction of wall assemblies, and installation of acoustic doors, ceilings, and flooring to enhance sound isolation and control. Existing restrooms are being renovated to provide ADA accessibility. Selective replacement of mechanical and electrical systems is included to support project areas. The renovation impacts approx. 57,305 SF and is primarily limited to interior construction within an existing three-story academic building of original masonry construction. Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression); 3) Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical.
Posted Date
Dec 29, 2025
Due Date
Feb 4, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 4, 2026
In general, the work consists of: acoustic improvements within the Center of the Arts Music Department, including upgrades to practice rooms, ensemble/classroom spaces, faculty instructional studios, a secondary wing of practice labs, and the recital hall. Work includes selective interior demolition, reconstruction of wall assemblies, and installation of acoustic doors, ceilings, and flooring to enhance sound isolation and control. Existing restrooms are being renovated to provide ADA accessibility. Selective replacement of mechanical and electrical systems is included to support project areas. The renovation impacts approx. 57,305 SF and is primarily limited to interior construction within an existing three-story academic building of original masonry construction. Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression); 3) Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical.
AvailableProvision of Building Commissioning Services for the Central Crime Lab Medical Examiner Building and Lab Expansion - Phase 1.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Provision of Building Commissioning Services for the Central Crime Lab Medical Examiner Building and Lab Expansion - Phase 1.
AvailablePhysics building lab 186 renovation - 2026.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
Physics building lab 186 renovation - 2026.
AvailableThe City of San Diego is soliciting proposals for Construction Management Services to support the Engineering & Capital Projects Department for the EMTS NTC Lab Remodel and NTC Lab Solar Implementation, including ELAP compliance upgrades, HVAC/mechanical/system modernizations, construction of a new Ocean Operations lab, and installation of photovoltaic systems. The solicitation is an RFP posted 2026-01-06 with proposals due 2026-02-10 16:00 PST (2026-02-11T00:00:00Z). The estimated construction cost is about $30 million and the Citys Purchasing & Contracting Department is the issuing office; contact listed is Edwin Ramos (ERRamos@sandiego.gov, 619-236-6682).
Posted Date
Jan 6, 2026
Due Date
Feb 11, 2026
Release: Jan 6, 2026
Close: Feb 11, 2026
The City of San Diego is soliciting proposals for Construction Management Services to support the Engineering & Capital Projects Department for the EMTS NTC Lab Remodel and NTC Lab Solar Implementation, including ELAP compliance upgrades, HVAC/mechanical/system modernizations, construction of a new Ocean Operations lab, and installation of photovoltaic systems. The solicitation is an RFP posted 2026-01-06 with proposals due 2026-02-10 16:00 PST (2026-02-11T00:00:00Z). The estimated construction cost is about $30 million and the Citys Purchasing & Contracting Department is the issuing office; contact listed is Edwin Ramos (ERRamos@sandiego.gov, 619-236-6682).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →