Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
In general, the work consists of: acoustic improvements within the Center of the Arts Music Department, including upgrades to practice rooms, ensemble/classroom spaces, faculty instructional studios, a secondary wing of practice labs, and the recital hall. Work includes selective interior demolition, reconstruction of wall assemblies, and installation of acoustic doors, ceilings, and flooring to enhance sound isolation and control. Existing restrooms are being renovated to provide ADA accessibility. Selective replacement of mechanical and electrical systems is included to support project areas. The renovation impacts approx. 57,305 SF and is primarily limited to interior construction within an existing three-story academic building of original masonry construction. Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression); 3) Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
In general, the work consists of: reconstruction of existing parking lot pavement and base with reduction in overall footprint; site grading improvements including installation of concrete curb/flume drainage way, pipe underdrains, parking lot surface grade adjustment; and widening of drainage way at the southern limits; extension of outdoor lighting (parking lot lights) utilizing LED fixtures; addition of a dumpster enclosure with swing gates; excavation/grading/base aggregate for additional parking stalls at the front of the building; construction of concrete sidewalk; and surface restoration including pavement marking and turf restoration.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
In general, the work consists of: reconstruction of existing parking lot pavement and base with reduction in overall footprint; site grading improvements including installation of concrete curb/flume drainage way, pipe underdrains, parking lot surface grade adjustment; and widening of drainage way at the southern limits; extension of outdoor lighting (parking lot lights) utilizing LED fixtures; addition of a dumpster enclosure with swing gates; excavation/grading/base aggregate for additional parking stalls at the front of the building; construction of concrete sidewalk; and surface restoration including pavement marking and turf restoration.
AvailableWork includes lab building construction.
Posted Date
Jan 13, 2026
Due Date
Feb 24, 2026
Release: Jan 13, 2026
Close: Feb 24, 2026
Work includes lab building construction.
AvailableCapital improvements - CRSD high schools north and south tech lab exhaust systems.
Posted Date
Jan 21, 2026
Due Date
Mar 27, 2026
Release: Jan 21, 2026
Close: Mar 27, 2026
Capital improvements - CRSD high schools north and south tech lab exhaust systems.
AvailableThe work includes mechanical, electrical, plumbing, and fire protection (MEP) divisions of work.
Posted Date
Dec 9, 2025
Due Date
Feb 11, 2026
Release: Dec 9, 2025
Close: Feb 11, 2026
The work includes mechanical, electrical, plumbing, and fire protection (MEP) divisions of work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis