Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
In general, the work consists of: sanitary system improvement projects at three (3) state parks: Interstate State Park: Replace sanitary sewer mains. Rehab existing lift station. Replace lift station 3 pumps, grinder, piping, electrical components, and control components. Pattison State Park: Replace filtered effluent pumps in existing lift station. Replace piping up to 6 pump disconnect and floats. Copper Falls State Park: Replace Private Onsite Wastewater Treatment System (POWTS).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableIn general, the work consists of: removal and replacement of approximately 9200 SY of asphalt pavement and base course, and 1000 LF of culverts. Project also includes clearing and grubbing, concrete replacement, guardrail replacement, pavement marking, erosion control, and aggregate shoulder.
Posted Date
Nov 17, 2025
Due Date
Jan 15, 2026
Release: Nov 17, 2025
Close: Jan 15, 2026
In general, the work consists of: removal and replacement of approximately 9200 SY of asphalt pavement and base course, and 1000 LF of culverts. Project also includes clearing and grubbing, concrete replacement, guardrail replacement, pavement marking, erosion control, and aggregate shoulder.
AvailableProcurement for two contracts: Sanitary Sewer System Improvements (Phase I: investigation including video inspection and manhole work; Phase II: construction including CIPP, pipebursting, and manhole rehabilitation) and Wastewater Treatment Facility Improvements (installation of mechanical micro bar screen, biofiltration, UV disinfection, sludge de-watering, lift station rehabilitation, stationary generator, electrical & control improvements, and sludge retention basin construction).
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement for two contracts: Sanitary Sewer System Improvements (Phase I: investigation including video inspection and manhole work; Phase II: construction including CIPP, pipebursting, and manhole rehabilitation) and Wastewater Treatment Facility Improvements (installation of mechanical micro bar screen, biofiltration, UV disinfection, sludge de-watering, lift station rehabilitation, stationary generator, electrical & control improvements, and sludge retention basin construction).
Ull reconstruction includes installation of a new sanitary sewer main and abandoning the existing septic sewer system; storm sewer installation and water main relocation; and PCC paving of streets, sidewalks, and driveways.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Ull reconstruction includes installation of a new sanitary sewer main and abandoning the existing septic sewer system; storm sewer installation and water main relocation; and PCC paving of streets, sidewalks, and driveways.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis