Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of install approximately 11,000 LF of 16" c909 PVC waterline within the rightof-way, install approx. 22,000 LF of two 3" schedule 90 PVC conduits in a shared trench with the waterline, perform open-cut and trenchless (bore) installation methods, including all necessary fittings, connections, and restoration, maintain continuous water service during construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of 7,000 ft of 8-inch HDPE waterline with tie-ins to existing mains and service lines; installation of fire hydrants, gate valves, and air-vac valves. Project is bid as a single contract tied to one other project (bidders must bid all tied items). Mandatory pre-bid conference attendance required. Owner estimate ~$675,000; completion expected by 2026-11-15.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of 7,000 ft of 8-inch HDPE waterline with tie-ins to existing mains and service lines; installation of fire hydrants, gate valves, and air-vac valves. Project is bid as a single contract tied to one other project (bidders must bid all tied items). Mandatory pre-bid conference attendance required. Owner estimate ~$675,000; completion expected by 2026-11-15.
Premium
Access the largest public sector contact database
Project consists of advanced traffic management system (atms) to install fiber optic cable and additional intelligent transportation system devices.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Project consists of advanced traffic management system (atms) to install fiber optic cable and additional intelligent transportation system devices.
AvailableConstruction of the waterline replacement project.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
Construction of the waterline replacement project.
AvailableSealed-bid public works construction for the I-5 Port of Tacoma Road Interchange Phase 2A: reconstruct northbound off-ramp and on-ramp to new intersections, construct a new bridge on 34th Avenue East over I-5, and extend the waterline across the new bridge. Federal-aid highway project with a 13% FSBE goal; standard bid bond and submittal requirements apply.
Posted Date
Nov 25, 2025
Due Date
Jan 27, 2026
Release: Nov 25, 2025
Close: Jan 27, 2026
Sealed-bid public works construction for the I-5 Port of Tacoma Road Interchange Phase 2A: reconstruct northbound off-ramp and on-ramp to new intersections, construct a new bridge on 34th Avenue East over I-5, and extend the waterline across the new bridge. Federal-aid highway project with a 13% FSBE goal; standard bid bond and submittal requirements apply.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis