Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of install approximately 11,000 LF of 16" c909 PVC waterline within the rightof-way, install approx. 22,000 LF of two 3" schedule 90 PVC conduits in a shared trench with the waterline, perform open-cut and trenchless (bore) installation methods, including all necessary fittings, connections, and restoration, maintain continuous water service during construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide waterline construction, labor, and equipment.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
Provide waterline construction, labor, and equipment.
AvailableThe project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
AvailableProject includes the following Work: Installation of approx. 10,750 LF of 3" PVC waterline with associated valves and ties to existing waterlines.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
Project includes the following Work: Installation of approx. 10,750 LF of 3" PVC waterline with associated valves and ties to existing waterlines.
AvailableSealed-bid public works construction for the I-5 Port of Tacoma Road Interchange Phase 2A: reconstruct northbound off-ramp and on-ramp to new intersections, construct a new bridge on 34th Avenue East over I-5, and extend the waterline across the new bridge. Federal-aid highway project with a 13% FSBE goal; standard bid bond and submittal requirements apply.
Posted Date
Nov 25, 2025
Due Date
Jan 27, 2026
Release: Nov 25, 2025
Close: Jan 27, 2026
Sealed-bid public works construction for the I-5 Port of Tacoma Road Interchange Phase 2A: reconstruct northbound off-ramp and on-ramp to new intersections, construct a new bridge on 34th Avenue East over I-5, and extend the waterline across the new bridge. Federal-aid highway project with a 13% FSBE goal; standard bid bond and submittal requirements apply.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis