Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Caddo Basin Special Utility District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Secretary/Treasurer
President
General Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Caddo Basin Special Utility District
Provide waterline construction, labor, and equipment.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Caddo Basin Special Utility District
Close: Feb 13, 2026
Provide waterline construction, labor, and equipment.
AvailableCaddo Basin Special Utility District
The project consist of approx 1,425 LF 12" PVC water pipe; 3,260 LF 12" yelomine locking water pipe; 120 LF 16" PVC; 100 LF 20" 40 steel casing pipe; 4,685 LF tracer wire; 20 EA 6" PVC valve box. See outside link and attached file.
Posted Date
Jul 16, 2025
Due Date
Jul 29, 2025
Release: Jul 16, 2025
Caddo Basin Special Utility District
Close: Jul 29, 2025
The project consist of approx 1,425 LF 12" PVC water pipe; 3,260 LF 12" yelomine locking water pipe; 120 LF 16" PVC; 100 LF 20" 40 steel casing pipe; 4,685 LF tracer wire; 20 EA 6" PVC valve box. See outside link and attached file.
Caddo Basin Special Utility District
Furnish and install 0.75 MG wire-wound, prestressed underground concrete ground storage tank assembly with appurtenances; Furnish and install complete Control/Disinfection/Electrical Building with valves, electrical, piping, LAS disinfection, chlorine gas disinfection with appurtenances; 675 SY Furnish and install concrete drive; Furnish and install diesel generator.
Posted Date
Mar 6, 2025
Due Date
Mar 25, 2025
Release: Mar 6, 2025
Caddo Basin Special Utility District
Close: Mar 25, 2025
Furnish and install 0.75 MG wire-wound, prestressed underground concrete ground storage tank assembly with appurtenances; Furnish and install complete Control/Disinfection/Electrical Building with valves, electrical, piping, LAS disinfection, chlorine gas disinfection with appurtenances; 675 SY Furnish and install concrete drive; Furnish and install diesel generator.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.