CityGA
Posted
Oct 20, 2026
Nov 19, 2026
27-014 - Trenchless Stormwater Pipe Rehabilitation Project - 2027 RFP
Seeking a qualified contractor to rehabilitate existing stormwater infrastructure utilizing cured-in-place pipe (CIPP) lining methods.
Description: The principal items of the contract include, but are not limited to, rebuilding of three stormwater pumps. The project locations are at the SBDD S-2, S-7, and S-8 Pump Stations.
SpecialDistrict · FL, US
Decision makers connected to this RFP from South Broward Drainage District.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityGA
Posted
Oct 20, 2026
Nov 19, 2026
Seeking a qualified contractor to rehabilitate existing stormwater infrastructure utilizing cured-in-place pipe (CIPP) lining methods.
CityWI
Posted
Oct 29, 2026
Nov 17, 2026
Contract consists of stormwater pond dredging of approx., 800 CY of material and miscellaneous repairs to stormwater endwalls.
Special DistrictCA
Posted
Oct 29, 2026
Nov 17, 2026
Work includes approx 1,099 LF of 6" pipeburst VCP sewer with 6.63" OD DR17 HDPE sewer main; 5 EA remove and replace manhole frame and cover, adjust to grade; 1,500 SF 2" AC grind and overlay; 2,198 LF of clean and televise sewer mains pre and post construction.
North Tonawanda City School District
School DistrictNY
Posted
Oct 17, 2026
Nov 18, 2026
Capital Outlay Project 2026-2027.