Summary
Rehabilitation of existing sewage lift stations, which consists of, but not limited to, by-pass pumping, replacement of all lift station equipment control panels/enclosures, safety switches (disconnects), meter cans, discharge piping, fittings, valves, check valves, flow meter, guide rails, pipe bracing, base ells, mounting plates, wet well cleaning, wet well lining, wet well top replacement, removal or abandonment of the valve vault/meter vault, install new chain-link
fence, relocation of the existing water meter/backflow assembly service, installation of a new aboveground meter, remove existing / install new Automatic Transfer Switches (ATS), and installation of reinforced concrete driveways.