Summary
project consists of construction of a new triplex submersible pump lift station with approximate dimensions of 17.5'L x 15.2'W x 44'D, with an integrated valve vault, all new electrical and controls for the new lift station which will include renovation of a new interior room in the existing electrical building to house the new controls equipment, and a wastewater flow splitter vault that will allow the Owner to divert flow to either lift station, approximately 156 linear feet of new 30-inch sewer pipe, two (2) new manholes, and approximately 60 linear feet of new ductile iron force main, including all appurtenances.