Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves work on two existing irrigation ponds. Also include remove and dispose of HDPE/PVC liners and replace them with reinforced concrete liners on the existing soil slopes. Work includes 3,300 LF of Replace Existing Joint Sealant; 1,541 SY of Remove Existing HDPE/PVC Liner; 1,541 SY of Smooth Existing Slopes; 1,541 SY of Install New Reinforced Concrete liner; leak testing; install safety lines; Construction Surveying. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
On Call Concrete.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
On Call Concrete.
AvailableOn Call Concrete.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
On Call Concrete.
AvailableThe general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.
Posted Date
Oct 17, 2025
Due Date
Jan 13, 2026
Release: Oct 17, 2025
Close: Jan 13, 2026
The Western Tidewater Community Services Board issued an Invitation for Bid for commercial cleaning services at the Saratoga Clinic in Suffolk, Virginia, requesting routine cleaning three times per week with an initial one-year term and up to three one-year renewal options. A mandatory pre-bid conference is scheduled for December 16, 2025 at 10:00 AM; bids are due January 5, 2026.
Posted Date
Nov 24, 2025
Due Date
Jan 5, 2026
Release: Nov 24, 2025
Close: Jan 5, 2026
The Western Tidewater Community Services Board issued an Invitation for Bid for commercial cleaning services at the Saratoga Clinic in Suffolk, Virginia, requesting routine cleaning three times per week with an initial one-year term and up to three one-year renewal options. A mandatory pre-bid conference is scheduled for December 16, 2025 at 10:00 AM; bids are due January 5, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.