CountyWY
Aug 25, 2026
Closes
Sep 10, 2026
Walker Creek Road Overlay RFP
The Project extends approximately 3.8 miles and consists of 1.9 miles of 4-foot widening and a 2-inch overlay along the full 3.8-mile length of the project. The Project generally begins at the intersection of Highway 59 and Walker Creek Road. Approximately 9,500 tons of crushed base gravel and 9,990 tons of asphalt, and several other appurtenant bid items will be used on the project