Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 3,203 LF 8" HDPE by pipe bursting; 16 EA service lateral reconnection in sections rehabilitated by pipe bursting; 1,173 LF 8" by CIPP via Water or steam curing; 23 VF manhole rehabilitation by cement-mortar. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project is described as the construction of a 18" sanitary sewer replacing the existing 12" sanitary sewer. This project consists of approx 2,500 LF of new 18" sanitary sewer main. The existing 12” sanitary sewer will be abandoned or removed to facilitate the construction of the new sanitary sewer interceptor. Tree removal, pavement patching, multi use path replacement, bypass pumping and sidewalk replacement will be completed as necessary
Posted Date
Dec 17, 2026
Due Date
Jan 13, 2026
Release: Dec 17, 2026
Close: Jan 13, 2026
The project is described as the construction of a 18" sanitary sewer replacing the existing 12" sanitary sewer. This project consists of approx 2,500 LF of new 18" sanitary sewer main. The existing 12” sanitary sewer will be abandoned or removed to facilitate the construction of the new sanitary sewer interceptor. Tree removal, pavement patching, multi use path replacement, bypass pumping and sidewalk replacement will be completed as necessary
AvailableSeeking contractors for the construction of approximately 2,500 linear feet of new 18-inch sanitary sewer, including tree removal, pavement patching, multi-use path replacement, bypass pumping, and sidewalk replacement.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Seeking contractors for the construction of approximately 2,500 linear feet of new 18-inch sanitary sewer, including tree removal, pavement patching, multi-use path replacement, bypass pumping, and sidewalk replacement.
AvailableWork includes 2,450 LF, 12 DIP sanitary sewer (open cut), 532 LF pipe burst existing 8" pipe to 12" HDPE sanitary sewer, 811 LF pipe burst existing 10" pipe to 12" HDPE sanitary sewer, 60 LF 24" steel casing (open cut), 26 sanitary sewer manholes to be replaced or rehabilitated (232 VF total), bypass pumping, site restoration.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
Work includes 2,450 LF, 12 DIP sanitary sewer (open cut), 532 LF pipe burst existing 8" pipe to 12" HDPE sanitary sewer, 811 LF pipe burst existing 10" pipe to 12" HDPE sanitary sewer, 60 LF 24" steel casing (open cut), 26 sanitary sewer manholes to be replaced or rehabilitated (232 VF total), bypass pumping, site restoration.
AvailableSanitary Sewer Relining. Major items include 1,350 LF of 10” CIPP.
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Sanitary Sewer Relining. Major items include 1,350 LF of 10” CIPP.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis