Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking contractors for the construction of approximately 2,500 linear feet of new 18-inch sanitary sewer, including tree removal, pavement patching, multi-use path replacement, bypass pumping, and sidewalk replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project is described as the construction of a 18" sanitary sewer replacing the existing 12" sanitary sewer. This project consists of approx 2,500 LF of new 18" sanitary sewer main. The existing 12” sanitary sewer will be abandoned or removed to facilitate the construction of the new sanitary sewer interceptor. Tree removal, pavement patching, multi use path replacement, bypass pumping and sidewalk replacement will be completed as necessary
Posted Date
Dec 17, 2026
Due Date
Jan 13, 2026
Release: Dec 17, 2026
Close: Jan 13, 2026
The project is described as the construction of a 18" sanitary sewer replacing the existing 12" sanitary sewer. This project consists of approx 2,500 LF of new 18" sanitary sewer main. The existing 12” sanitary sewer will be abandoned or removed to facilitate the construction of the new sanitary sewer interceptor. Tree removal, pavement patching, multi use path replacement, bypass pumping and sidewalk replacement will be completed as necessary
AvailableProject includes approximately 4,400 LF of sanitary sewer lining, 16 spot repairs, and 25 manhole adjustments.
Posted Date
Jan 9, 2026
Due Date
Feb 12, 2026
Release: Jan 9, 2026
Close: Feb 12, 2026
Project includes approximately 4,400 LF of sanitary sewer lining, 16 spot repairs, and 25 manhole adjustments.
AvailableWork includes 1 LS color audio/video recording pre and post construction (dvd); 2,100 LF cctv inspection (pre construction); 2,772 lf cctv inspection (post construction); 1 LS bypass pumping; 1 ls dewatering; 1 ls deflection test (<24"); 10 EA cipp patch/point repair (8" diameter sewer); 1 EA cipp patch/point repair (12" diameter sewer); 939 LF trench excavation and backfill 0-10'; 1,557 lf trench excavation and backfill 0-15'; 152 LF trench excavation and backfill 0-20'; 91 LF 8" sewer pipe (pvc - sdr-35); 1,262 LF 8" sewer pipe (pvc - sdr-26); 843 LF 12" sewer pipe (pvc - sdr-35); 452 LF 12" sewer pipe (pvc - sdr-26). See attached file.
Posted Date
Dec 20, 2025
Due Date
Jan 20, 2026
Release: Dec 20, 2025
Close: Jan 20, 2026
Work includes 1 LS color audio/video recording pre and post construction (dvd); 2,100 LF cctv inspection (pre construction); 2,772 lf cctv inspection (post construction); 1 LS bypass pumping; 1 ls dewatering; 1 ls deflection test (<24"); 10 EA cipp patch/point repair (8" diameter sewer); 1 EA cipp patch/point repair (12" diameter sewer); 939 LF trench excavation and backfill 0-10'; 1,557 lf trench excavation and backfill 0-15'; 152 LF trench excavation and backfill 0-20'; 91 LF 8" sewer pipe (pvc - sdr-35); 1,262 LF 8" sewer pipe (pvc - sdr-26); 843 LF 12" sewer pipe (pvc - sdr-35); 452 LF 12" sewer pipe (pvc - sdr-26). See attached file.
AvailableWork includes 2,450 LF, 12 DIP sanitary sewer (open cut), 532 LF pipe burst existing 8" pipe to 12" HDPE sanitary sewer, 811 LF pipe burst existing 10" pipe to 12" HDPE sanitary sewer, 60 LF 24" steel casing (open cut), 26 sanitary sewer manholes to be replaced or rehabilitated (232 VF total), bypass pumping, site restoration.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
Work includes 2,450 LF, 12 DIP sanitary sewer (open cut), 532 LF pipe burst existing 8" pipe to 12" HDPE sanitary sewer, 811 LF pipe burst existing 10" pipe to 12" HDPE sanitary sewer, 60 LF 24" steel casing (open cut), 26 sanitary sewer manholes to be replaced or rehabilitated (232 VF total), bypass pumping, site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →