Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope of work for Contract No. 25-S2 includes complete manhole-to-manhole cured in-place lining of approximately 5,300 linear feet of 8" sanitary sewer, approximately 3 tap-in break removals, the location of existing buried manholes, as necessary, restoration of disturbed lawn and roadway areas resulting from manhole locating activities and all necessary appurtenances for said construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the lining of sanitary sewer and construction of a drainage structure.
Posted Date
Jan 26, 2026
Due Date
Feb 24, 2026
Release: Jan 26, 2026
Close: Feb 24, 2026
Procurement for the lining of sanitary sewer and construction of a drainage structure.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes but is not limited to, cleaning, televising and manhole to manhole cured-in-place pipe lining approx. 7,500 LF and 320 storm sewer pipe at various locations around the Township.
Posted Date
Jan 28, 2026
Due Date
Mar 4, 2026
Release: Jan 28, 2026
Close: Mar 4, 2026
Work includes but is not limited to, cleaning, televising and manhole to manhole cured-in-place pipe lining approx. 7,500 LF and 320 storm sewer pipe at various locations around the Township.
AvailablePump Station Basin: Sanitary Sewer Lining Project Contract 2026-01: General Construction: Installation of cured-in-place pipe lining within existing sanitary sewer gravity mains. Including 5,361 LF of 8" CIPP lining; 68 ea CIPP sewer lateral reinstatement; 7 ea CIPP internal grinder/cutting of existing laterals.
Posted Date
Jan 28, 2026
Due Date
Feb 27, 2026
Release: Jan 28, 2026
Close: Feb 27, 2026
Pump Station Basin: Sanitary Sewer Lining Project Contract 2026-01: General Construction: Installation of cured-in-place pipe lining within existing sanitary sewer gravity mains. Including 5,361 LF of 8" CIPP lining; 68 ea CIPP sewer lateral reinstatement; 7 ea CIPP internal grinder/cutting of existing laterals.
AvailableWork consists of lining 8,552 LF of 8" diameter, 1,373 LF of 10" diameter, and 694 LF of 12" diameter sanitary sewer; including heavy cleaning, protruding obstacle removal, service reinstatement, traffic control, and related restoration.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
Work consists of lining 8,552 LF of 8" diameter, 1,373 LF of 10" diameter, and 694 LF of 12" diameter sanitary sewer; including heavy cleaning, protruding obstacle removal, service reinstatement, traffic control, and related restoration.