Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of repair of the sanitary sewer system associated with pipe bursting and manhole repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes upgrades to existing lift station, smoke testing of approx. sewer lines, repair sewer gravity lines and cleanouts, rehabilitation and repairs of existing manholes.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Work includes upgrades to existing lift station, smoke testing of approx. sewer lines, repair sewer gravity lines and cleanouts, rehabilitation and repairs of existing manholes.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
AvailableProcurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableWork includes 2,450 LF, 12 DIP sanitary sewer (open cut), 532 LF pipe burst existing 8" pipe to 12" HDPE sanitary sewer, 811 LF pipe burst existing 10" pipe to 12" HDPE sanitary sewer, 60 LF 24" steel casing (open cut), 26 sanitary sewer manholes to be replaced or rehabilitated (232 VF total), bypass pumping, site restoration.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
Work includes 2,450 LF, 12 DIP sanitary sewer (open cut), 532 LF pipe burst existing 8" pipe to 12" HDPE sanitary sewer, 811 LF pipe burst existing 10" pipe to 12" HDPE sanitary sewer, 60 LF 24" steel casing (open cut), 26 sanitary sewer manholes to be replaced or rehabilitated (232 VF total), bypass pumping, site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.