Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovation of the police department's outdoor firearms range.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of one Law Enforcement Surveillance Trailer.
Posted Date
-
Due Date
Mar 3, 2026
Close: Mar 3, 2026
Procurement of one Law Enforcement Surveillance Trailer.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Georgia Bureau of Investigation is soliciting services for the analysis and comparison of firearms evidence to support forensic casework. Vendors will provide firearms comparison examinations and related forensic reporting in accordance with applicable standards and accreditation. Proposals must be submitted to the State of Georgia’s TeamWorks Supplier portal by the stated deadline.
Posted Date
Jan 23, 2026
Due Date
Feb 23, 2026
Release: Jan 23, 2026
Close: Feb 23, 2026
The Georgia Bureau of Investigation is soliciting services for the analysis and comparison of firearms evidence to support forensic casework. Vendors will provide firearms comparison examinations and related forensic reporting in accordance with applicable standards and accreditation. Proposals must be submitted to the State of Georgia’s TeamWorks Supplier portal by the stated deadline.
AvailableTo perform sewer system rehabilitation work at various locations throughout the city. The scope includes CIPP lining of existing sewer mains, top-hat service lateral repairs, and spot repairs of damaged sewer segments. The project also includes replacement of a sewer service lateral at 7th and a street, along with associated sidewalk and pavement removal and restoration.
Posted Date
Jan 25, 2026
Due Date
Feb 19, 2026
Release: Jan 25, 2026
Close: Feb 19, 2026
To perform sewer system rehabilitation work at various locations throughout the city. The scope includes CIPP lining of existing sewer mains, top-hat service lateral repairs, and spot repairs of damaged sewer segments. The project also includes replacement of a sewer service lateral at 7th and a street, along with associated sidewalk and pavement removal and restoration.
AvailableWork includes to remove and replace the roof. Remove and legally dispose of the existing roof system (including edge metal) to the concrete decking. Dry decking as needed of any moisture for adhesion of new insulation. Provide and install new 2.6" (r-15) roof insulation adhered directly to concrete deck with low rise, two component adhesive. Furnish and install new 60 mil white tpo roof system. New roof membrane shall be fully adhered system complete with all accessories and components needed for a watertight system. Existing vtr (vent thru roof) pipes to receive pre-fabricated boots with stainless steel bands. See outside link.
Posted Date
Jan 14, 2026
Due Date
Feb 25, 2026
Release: Jan 14, 2026
Close: Feb 25, 2026
Work includes to remove and replace the roof. Remove and legally dispose of the existing roof system (including edge metal) to the concrete decking. Dry decking as needed of any moisture for adhesion of new insulation. Provide and install new 2.6" (r-15) roof insulation adhered directly to concrete deck with low rise, two component adhesive. Furnish and install new 60 mil white tpo roof system. New roof membrane shall be fully adhered system complete with all accessories and components needed for a watertight system. Existing vtr (vent thru roof) pipes to receive pre-fabricated boots with stainless steel bands. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →