Massachusetts Department of Transportation
State AgencyMA
-
Closes
Sep 15, 2026
Wenham- Safety Improvements On Route 1A
Project includes Safety Improvements.
Description: Sand route improvements and restoration. The project will widen trails to standard width, improve drainage, and aid emergency access. The work will require heavy equipment operation on sand dunes. The main objectives are to widen trails to 16’ width, restore existing drainage structures, add drainage dips where possible, and raise/lower several sections of the route. Some routes are as little as 6’ wide and will require significant effort to clear trees and sand. See attached file.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
These related opportunities are still open for bidding.
Massachusetts Department of Transportation
State AgencyMA
-
Closes
Sep 15, 2026
Project includes Safety Improvements.
CityNJ
Aug 10, 2026
Closes
Aug 25, 2026
Work includes approx 1,756 LF of 18" sanitary sewer via pipe bursting; 379 LF of 18" sanitary sewer via open cut installation.
Connecticut Department of Transportation
State AgencyCT
Jul 24, 2026
Closes
Oct 24, 2026
The Connecticut Department of Transportation (CTDOT) is seeking qualifications from a Construction Manager/General Contractor (CM/GC) for preconstruction services and the construction phase of the Heroes Tunnel Rehabilitation and Route 15 Interchange 46 Improvements project. This CM/GC procurement covers State Project Nos. 0167-0108 and 0092-0689, located in the Towns of Woodbridge and Hamden and the City of New Haven, CT. Responses are due October 24, 2026, with detailed information accessible through the CT State Contracting Portal (CTSource).
CityCA
Aug 5, 2026
Closes
Aug 26, 2026
The work includes 5,120 LF of 6" Thermoplastic Traffic Stripe ; 370 LF of 8" Thermoplastic Traffic Stripe ; 570 SQFT of Thermoplastic Crosswalk and Pavement Marking ; 3,000 SQFT of Hydromulch; 3,000 SQFT of Hydroseed ; 26 SQFT of Detectable Warning Surface ; 3,000 SQYD of Cold Plane Asphalt Concrete Pavement ; 4 SQYD of Remove Concrete ; 890 CY of Roadway Excavation ; 680 CY of Class 2 Aggregate Base ; 35 CY of Minor Concrete (Curb and Gutter) ; 44 CY of Minor Concrete (Sidewalk) ; 11 CY of Minor Concrete (Curb Ramp) ; 4 CY of Minor Concrete (Textured Paving) ; 3 CY of Minor Concrete (Curb) ; 1,120 TON of Hot Mix Asphalt (Type A) ; 110 EA of Pavement Marker (Retroreflective) ; 5 EA of Roadside Sign - One Post ; 4 EA of Reestablish Monument ; 3 EA of Temporary Drainage Inlet Protection ; 2 EA of Portable Changeable Message Sign (EA) ; 1 EA of Remove Roadside Sign ; 1 EA of Relocate Roadside Sign - One Post ; 1 EA of Object Marker ; 1 EA of Adjust Inlet ; 1 EA of Adjust Manhole Frame and Cover (Utility) ; 1 LS each for Mobilization, Lead Compliance Plan, Construction Area Signs, Job Site Management, Traffic Control System, Water Pollution Control Program, and Hydroseed Watering.