Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The buyer is soliciting bids for improvements to the pool parking area serving Sanborn Park. Documents and submissions are managed via the MITN Purchasing Group (BidNet Direct) portal. Bids are due by 3:00 PM EST on February 3, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consist of approx 4,036 TON Aggregate Base Class 5; 1,350 TON Type SP 9.5 Wearing Course Mix (3;B); 3,067 SY Geotextile Fabric Type 5; 3,067 SY Geogrid Type 2; 10,505 LF Sediment Control Log Type Compost; 943 CY Common Topsoil Borrow; 1,795 SY Rolled Erosion Prevention Cat 30; 5,177 LF 4" Broken Line Multi Comp; 530 LF Concrete Curb & Gutter Design B612; 3,500 CY Common Excavation.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Project consist of approx 4,036 TON Aggregate Base Class 5; 1,350 TON Type SP 9.5 Wearing Course Mix (3;B); 3,067 SY Geotextile Fabric Type 5; 3,067 SY Geogrid Type 2; 10,505 LF Sediment Control Log Type Compost; 943 CY Common Topsoil Borrow; 1,795 SY Rolled Erosion Prevention Cat 30; 5,177 LF 4" Broken Line Multi Comp; 530 LF Concrete Curb & Gutter Design B612; 3,500 CY Common Excavation.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for the Bunten Road Park Improvement Project, encompassing the construction and refurbishment of park elements, multiuse trails, retaining walls, a bridge crossing, concrete amenities, paving, restroom renovation, storm water enhancements, green infrastructure, dam installations, streambank restoration, fencing, landscape improvements, and sidewalk construction, with optional stream restoration, pond improvements, and additional sidewalk sections.
Posted Date
-
Due Date
Jan 15, 2026
Release: -
Close: Jan 15, 2026
Procurement of services for the Bunten Road Park Improvement Project, encompassing the construction and refurbishment of park elements, multiuse trails, retaining walls, a bridge crossing, concrete amenities, paving, restroom renovation, storm water enhancements, green infrastructure, dam installations, streambank restoration, fencing, landscape improvements, and sidewalk construction, with optional stream restoration, pond improvements, and additional sidewalk sections.
AvailableThe project generally consists of grading and installation of a city park facility parking lot with demolition, clearing/grubbing, grading, stone/asphalt installation, lighting, electrical, sidewalk, final stabilization and associated miscellaneous work.
Posted Date
Jan 7, 2026
Due Date
Feb 2, 2026
Release: Jan 7, 2026
Close: Feb 2, 2026
The project generally consists of grading and installation of a city park facility parking lot with demolition, clearing/grubbing, grading, stone/asphalt installation, lighting, electrical, sidewalk, final stabilization and associated miscellaneous work.
AvailableThis project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
This project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →