Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include demolition of a 2,318 SF composite deck, footings and railings and the construction of a new concrete patio of nearly the same dimensions, a 35 x38 wood patio cover, shade sails and post supports, the replacement of a gravity sewer pipeline, and site drainage improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace trapezoidal HDPE lining with geosynthetic cementious composite matt (GCCM) lining; Reduce demolition of existing ditch lining.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
Replace trapezoidal HDPE lining with geosynthetic cementious composite matt (GCCM) lining; Reduce demolition of existing ditch lining.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work varies in scope from complete deck replacements to new deck surfaces and stair stringer replacements.
Posted Date
Nov 20, 2025
Due Date
Mar 2, 2026
Release: Nov 20, 2025
Close: Mar 2, 2026
Work varies in scope from complete deck replacements to new deck surfaces and stair stringer replacements.
AvailableApprox., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service re-connections, hydrant installation, surfacing repair, and related work. See outside link.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Approx., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service re-connections, hydrant installation, surfacing repair, and related work. See outside link.
AvailableProcurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
Posted Date
Dec 13, 2025
Due Date
Jan 14, 2026
Release: Dec 13, 2025
Close: Jan 14, 2026
Procurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →