Worm consist of temporary bypass at southeast lift station, 9,490 lf of furnish and install temporary livestock control fencing, 1,660 lf of furnish & install 5' barbed wire fence, 249 lf of furnish & install 6' chain link fence, 1 ea of furnish & install barbed wire fence, remove and salvage items within existing lift station, decommision and abandon existing lift station wet well & valve vault, abandon existing 18" gravity main (cut & plug) & bypass connection, abandon existing 12" force main (cut & plug) & bypass connection, 18 sy of remove existing concrete pad, 4 ea of remove and salvage 12" valves, 1 ea of remove existing sanitary manhole. See attached file.