Summary
Construction of a new two-story, 36,048 GSF Nursing and Allied Health Building.2.This includes several specialized labs spaces, including nursing, nurses aid, medical assisting, phlebotomy, surgical tech, and pharmacy. Several simulation labs are included in the design, including an EMS lab, Emergency Room lab, medical office, and residential lab. A covered drive-thru area adjacent to the simulated EMS and emergency rooms labs is in place to allow ambulatory access to the building and mimic real-world conditions for students. All spaces are supported by storage rooms for specialized tools and materials.3.General purpose classrooms, faculty offices, conferencing space, restrooms, vending, and a lobby are included.4.The new Building will be a Business (B) occupancy (Education above the 12th Grade), Type IIB Construction, and fully sprinklered.5.We anticipate using a steel structural framing system with roof bar joists and metal decking covered with 6” rigid insulation and a standing seam metal roof.6.Exterior walls will be brick veneer with a cavity for drainage, rigid insulation over either CMU or cold-formed metal framing as the inner wall. Shop areas will have the CMU, while classrooms and offices areas will use metal studs. Exterior metal wall panels will be utilized in lieu of brick in higher wall areas. Exterior walls will be non-load bearing.7.Interior walls will be CMU in Shop areas and metal stud with gypsum wall systems elsewhere.8.The interior shall have all new partitions and highly durable finish systems, plumbing, HVAC, and Electrical power, Lights, and data wiring. 9.The building will be protected by anew fire alarm system and be fully sprinklered. A fire pumps is included.10.New pedestrian walkway system and lighting will be required as indicated. Some hardscaping is designed along the exterior of the building.11.New domestic and fire lines will need to be extended to the building. A new gravity sewer line to tie into the existing is required. New electrical service will be required. A transformer for the building will be fed from the main transformer at Road and master metered. 12.New plumbing,HVAC, and Electrical Systems are required.13.Multiple Alternate Bids will be considered.