Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes asphalt surface course, asphalt intermediate course, pavement planing, concrete pavement removal and rigid replacement, miscellaneous sidewalk and curb replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2025-2026 M7B Snow Removal Services Salem Residency.
Posted Date
Aug 5, 2025
Due Date
Feb 14, 2026
Release: Aug 5, 2025
Close: Feb 14, 2026
2025-2026 M7B Snow Removal Services Salem Residency.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of materials, labor, equipment, and installation services for the 2025-2026 Locust Street -- Street Improvements Project.
Posted Date
Dec 29, 2025
Due Date
Jan 22, 2026
Release: Dec 29, 2025
Close: Jan 22, 2026
Procurement of materials, labor, equipment, and installation services for the 2025-2026 Locust Street -- Street Improvements Project.
AvailableThe City of Hays, Kansas (COH Project No. 2025-16) issued a sealed-bid solicitation for the 2026 Street Maintenance Program covering seal coating, polypatch, curb/brick repair, asphalt rejuvenator, concrete street reconstruction, and pavement markings across the city. A pre-bid conference is scheduled for January 6, 2026 at 1:30 PM and sealed bids are due to the City Clerk at City Hall by 3:00 PM, January 13, 2026. Bidders must provide a 5% cashier’s/certified check or bid bond; contracts over $100,000 require 100% Contract and Payment Bonds, and a $125 deposit is required to obtain contract documents.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
The City of Hays, Kansas (COH Project No. 2025-16) issued a sealed-bid solicitation for the 2026 Street Maintenance Program covering seal coating, polypatch, curb/brick repair, asphalt rejuvenator, concrete street reconstruction, and pavement markings across the city. A pre-bid conference is scheduled for January 6, 2026 at 1:30 PM and sealed bids are due to the City Clerk at City Hall by 3:00 PM, January 13, 2026. Bidders must provide a 5% cashier’s/certified check or bid bond; contracts over $100,000 require 100% Contract and Payment Bonds, and a $125 deposit is required to obtain contract documents.
AvailableWork contemplated for the above-named project includes removal and replacement of damaged concrete curb and driveway aprons, replacing limited sections of sidewalk, installation of handicap accessible curb ramps, resetting and/or repair of existing drainage structures, milling of the existing pavement surface, installation of pavement base course or base course repairs as needed as determined by visual inspection of the milled pavement surface and a 2" pavement surface course overlay, as well as all other work.
Posted Date
Jan 8, 2026
Due Date
Jan 21, 2026
Release: Jan 8, 2026
Close: Jan 21, 2026
Work contemplated for the above-named project includes removal and replacement of damaged concrete curb and driveway aprons, replacing limited sections of sidewalk, installation of handicap accessible curb ramps, resetting and/or repair of existing drainage structures, milling of the existing pavement surface, installation of pavement base course or base course repairs as needed as determined by visual inspection of the milled pavement surface and a 2" pavement surface course overlay, as well as all other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →