CityTX
Posted
Oct 1, 2026
Oct 22, 2026
Water and Sanitary Sewer Main Replacement Project
The project includes the installation of pipe, valves, fire hydrants, pipe fittings, manholes, and trench and street repairs.
Description: Work includes cure-in-place rehabilitation of approx 23,500 LF of 48" to 72" fiberglass reinforced plastic sewer mains at various depths and replacement and/or rehabilitation of associated manholes; replacement of three siphon structure lids will be required; bypass of large diameter sanitary sewer mains will be required.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from San Antonio Water System.
Adjacent opportunities open for bidding right now.
CityTX
Posted
Oct 1, 2026
Oct 22, 2026
The project includes the installation of pipe, valves, fire hydrants, pipe fittings, manholes, and trench and street repairs.
Special DistrictTX
Posted
Jun 8, 2026
Oct 20, 2026
Construction of approx 184 LF of 8" PVC sanitary sewer main by jack-and-bore, grout abandonment of approx 200 LF of existing 8" sanitary sewer main within an existing 16' sewer easement. The project also consists of installation of approx 59 LF of 8" to 12" PVC sanitary sewer main by open-cut methods, sanitary sewer manhole installation, sewer bypass operations, and traffic control.
CityTX
Posted
Sep 22, 2026
Oct 16, 2026
Construct approx., 400 LF of concrete trail, trail width shall be 6 feet; 4"-thick concrete with #4 rebar reinforcement and 2" minimum compacted base with 6"x8" turndown beam at edge of sidewalk and strengthened expansion joints; perform all clearing, grading, excavation, and restoration - 3 feet clearing on both side of the concrete trail (12-foot clearing width in total). Install compacted base material and concrete.
CityNY
Posted
Sep 25, 2026
Oct 19, 2026
Sanitary Sewer Main Replacement - Schultz Way project shall include the removal and replacement of a section of existing public, gravity sanitary sewer main, in kind. The scope of work includes removal of the existing main line section, installation and removal of temporary sanitary bypass systems to ensure continued operation of the overall system, removal and reconnection of all existing sanitary sewer lateral service connections, installation of the new sanitary sewer main, connection to existing sanitary manholes and sewer laterals, subgrade improvements, pavement restoration.