Summary
Work includes rehabilitation of the historic landing in memorial park, structural repairs to the dam located in city park, and shotcrete repairs with rock anchors to an overhang. Installation of Care of Water measures (cofferdams, diversions, etc.) as necessary to protect the Work and facilitate construction. Stabilization of a rock overhang with shotcrete and passive rock anchors. Replacement of two sluice gates on the masonry dam. Fabrication and installation of steel debris impact deflection. Repair of the dam crest with shotcrete and reinforcement. Rehabilitation of the Twin Springs landing structure and adjacent park elements. Stabilization by topsoil and grass of all areas disturbed by construction activities. Also includes 100 CY of rock overhang shotcrete; 50 EA of passive rock anchors, see attached files.