Summary
Work includes Installation of temporary erosion and sediment control; Dewatering and water control; clearing and grubbing; stripping the work area; Excavation and cohesive fill/backfill, Trenching for installation of underground electric power supply for the automatic sampler and flow measurement, Mechanical agitation of the dewatered sludge to facilitate removal by pumping by vacuum truck, Fence removal and replacement to allow installation of the new discharge channel, headwall, and riprap outlet; Sludge removal by pumping and land application disposal, Regrading and revegetation of disturbed areas; Removal of erosion and sediment control measures.