Summary
Work includes 1 LS traffic control; 1 LS temporary pedestrian access route (tpar); 1 EA reconstruct diversion box - raise; 5 EA reconstruct catch basin - lower; 3 EA reconstruct meter box - raise; 3 EA reconstruct valve box - lower; 5 EA reconstruct manhole - lower; 6 EA reconstruct sanitary sewer manhole; 269 LF remove guardrail; 763 LF remove fence; 31 LS remove pipe; 2,599 SY remove concrete sidewalk; 476 SY remove concrete driveway; 33 LF remove concrete curb; 4,459 LF remove concrete curb and gutter; 12,329 SY remove asphalt pavement; 42 LF remove precast concrete barrier; 4 CY abandon pipe. See attached file.